Profile
Vision & Strategy
Board of Directors
Management
Announcements
Company Reports
Presentations
Share Registry
Photo Gallery
Video
Project Pipeline
QLD Projects
Forsayth FNQ
NSW Projects
Huntingfield
Sofala
Karangi
Gowulma-Gunners
Wamboyne
Beehive East
Mooculta
Puggoon
Burraway
Honeybugle
Yarran
Bullamalito
FOLLOW
 
Forsayth FNQ

 

 

The Forsayth Project is Altius Mining Limited’s flagship and wholly owned project located in Far North Queensland. The gold treatment plant is expected to be commissioned in mid-2012, and includes crushing, gravity and flotation circuits. Test mining and processing has commenced.

 

 

Key Statistics  
LICENCE NO ML3417, ML3418, EPM14498
LOCATION Forsayth, FNQ (400km south-west of Cairns, 60km north-west of the Kidston Gold Mine)
PROJECT PHASE

Production (ML3417 Ropewalk, ML3418 Flying Cow)

 

Feasibility (ML3417 New Gossan, EPM14498 Queenslander, EPM14498 Lady Franklin, EPM14498 Lightning & Lightning Flash)

SIZE 73 Sq Km
OWNERSHIP 100%
PRODUCT Gold
REGIONAL GEOLOGY

EPM 14498 is approximately 80 km2 and contains over 100 old workings and mines. The area appears to be part of a much larger ‘duplex’ system, strikingly similar geologically to many of the world’s significant gold deposits.

 

The Kidston Magnetic Linearment, locally known as the Big Reef Fault (BRF) passes through Altius’ tenements. The pull apart enchelon faults are ideal sites for the deposition of mineral rich fluids. Gold mineralization occurs within quartz veins typically hosted by narrow 2 to 5m wide faul or shear zones structures, some of which can be traced for many kilometres. The west-northwest trending BRF zone extends over 20 km.

LOCATION RATIONALE

Tenements cover part of the historic Etheridge Goldfield where numerous, structurally-controlled, gold-bearing quartz veins were selectively mined in the past.

 

Refer to the FNQ Regional Geology Map  showing the relationship between Altius’ assets and their location, along strike of the multi-million oz Kidston Gold Mine

TARGETS Low tonnage high-grade narrow quartz veins and larger disseminated lower-grade structures
PROPOSED MINING METHOD Open cut and underground
STATUS & COMPANY GOALS

Mining infrastructure and environmental permits in place.

 

Altius completed RC percussion drilling programme at its Ropewalk gold deposit in ML 3417, near Forsayth. Drilled 16 holes for a total of approximately 700 metres. Full results of the programme are in Company Announcements on the ASX web site or click here.

 

Operations to be expanded 2012.

RELATED INFORMATION

Existing government magnetics showing the Kidston Magnetic Linearment

 

Location of high grade lodes and processing plant within Altius MLs

 

 
  Level 3, 521 Toorak Road, Toorak, Victoria 3142, Australia
Tel. : 1300 136 453 | Email : info@altiusmining.com
Copyright 2011 Altius Mining. All rights reserved.